Inside Guanhui 70,000㎡ Steel Structure Factory Build – Part 2: Panel Installation & Fire System Setup

GuanHui’s new 70,000㎡ steel structure factory is progressing rapidly and steadily. In the last few days, the construction team has completed the erection of steel ground columns, inter-column supports, and bollards, establishing the main framework of this large-scale industrial facility.

Now, let’s take a closer look at the next developments in this steel structure construction phase.

Steel Structure Progress: Purlins and Wall Panel Preparation

With the primary steel frame in place, workers are now installing steel purlins, which provide support for the upcoming wall and roof panels. These purlins are crucial components in the steel structure system, ensuring stability and load distribution.

Once completed, the wall panels will be directly installed on the purlins, enclosing the building and enhancing structural integrity.

Ground Paving Underway

While a majority of the site has been leveled, some ground areas are still under construction, where workers are completing the paving and compacting processes. A solid, durable ground surface is essential for supporting heavy machinery and smooth logistics within the factory.

Fireproof & Heat-Resistant Steel Cladding

The exterior walls and roof of the steel structure building are made of fire-rated and heat-resistant materials, specifically designed for industrial applications. These high-performance materials offer excellent thermal insulation and ensure reliable protection in extreme conditions.

Fireproof & Heat-Resistant Steel Cladding
Inside Guanhui 70,000㎡ Steel Structure Factory Build – Part 2: Panel Installation & Fire System Setup 1

Fire Protection System Installation

As safety is a core principle of Guanhui’s factory design, the fire protection system is being installed alongside the steel structure. This system is engineered to respond rapidly in case of fire, minimizing risk to equipment, workers, and infrastructure.

Key components include:

  • Sprinkler piping integrated into the steel framework
  • Fire hydrant placement and safety access points
  • System compatibility with future intelligent monitoring systems
Fire Protection System Installation
Inside Guanhui 70,000㎡ Steel Structure Factory Build – Part 2: Panel Installation & Fire System Setup 2

What’s Coming Next

The next stages in this steel structure factory project will include:

  • Testing of fire safety systems for full operational readiness
  • Laying of utility infrastructure including power, water, and air supply systems
  • Planning and marking of the production line layout inside the steel structure

These efforts will lay a solid foundation for Guanhui to build a modern and intelligent production base.